Friars Walk Development, Newport, South Wales
A redevelopment of the city centre required the construction of a long contiguous wall into competent mudstone at depth.
Our alternative design solution using our rotary rock drilling capability, provided a considerable saving to the original king post design in terms of both cost and time.